Ramp and Fill


• Begins in a horizontal stope.

• Uses mechanized drills for blasting and
  load-haul-dump (LHD) mucking machines
   to haul away the ore using an access ramp.

• Adances in the stope are made in 9-foot
   increments. After the stope is mined out,
   it is then backfilled with waste rock and sand
   to become the floor for the next horizontal
   stope, moving upward in
   10-foot increments.