Ramp and Fill • Begins in a horizontal stope. • Uses mechanized drills for blasting and load-haul-dump (LHD) mucking machines to haul away the ore using an access ramp. • Adances in the stope are made in 9-foot increments. After the stope is mined out, it is then backfilled with waste rock and sand to become the floor for the next horizontal stope, moving upward in 10-foot increments. |
![]() |
| | |
|
|
||