Sub-Level Stoping


• Involves a ramp along the footwall of the
   reef to access to the ore-body at 30 to 40   
   foot vertical intervals.

• Ore is removed from the open stopes using
   a remote-controlled LHD vehicle.

1
| 2 |  | 4 | 5 | Next Page>>  
  

Overview
| Stillwater Complex | Mining OperationsProcessing Operations | Human Resources | Corporate Governance | Investor Relations | Site Map | Links
Copyright 2007©, Stillwater Mining Company